News Flash Home
The original item was published from 4/15/2016 7:08:26 AM to 5/17/2016 12:05:00 AM.

News Flash

Homepage News Flash

Posted on: April 15, 2016

[ARCHIVED] Third Schematic Design Option Released for Cerri Site (Purity Building)

Based on feedback during the public input sessions, TLCD Architects has prepared a third schematic design option for redevelopment of the Cerri Site (Purity Building) in downtown Healdsburg. The third option removes the existing building and redevelops the site with a parking lot and agrarian themed shade structure. Follow the link below for more images of all three schematic design options.

Additional Info...
Facebook Twitter Email